*Required field
Latest News Updates from our Twitter feed

Proud to confirm we will be donating the Christmas Tree for @MartinHouseCH who provide care for children with life https://t.co/8yXGb0v4aG
23rd November 2017

Category A Fit Out.

"A superb fit out project completed by RFM Group with a superb quality finish achieved"

Nolan Headley – Operations Director

PROJECT OVERVIEW.

  • Client. IT Luggage
  • Sector. Commercial
  • Site Location. London
  • Size. 12,000 st ft
  • Contract Value. £800,000

KEY BENEFITS.

  • Full Category A strip out including corporate HQ and showroom fit outs
  • All delivered by the RFM Group, on time and under budget
  • Removal of generator building housing 10,000 litres of oil to create additional car parking spaces

IT Luggage are a London based, Global supply business who were looking for a Principal contractor to undertake full Category A fit out of there UK headquarters. After approaching RFM Group as part of their tender exercise, RFM Group were awarded the £800k Design and Build works. IT Luggage were looking for a real WOW factor for their 120 HQ based staff and a truly amazing workspace for their existing clients.

RFM Group carried out refurbishment works including demolitions, alterations, design and build of a new extension. Mechanical, electrical, structured cabling and data, new stud and glass partition walls. New raised access flooring, washrooms, toilet facilities, decorations, lift refurbishment, were all part of the brief as was the creation of a stunning 3,500 sq ft showroom.

The project demanded the coordination of a high volume of staff to complete the project on time and without disruption to business. Precise project management enabled us to deliver the completed project on time and on budget.

The 32 week project was met with complete jubilation by the project team and the entire HQ staff.

Links + Downloads.

Hide